19 Jan use AutoCAD to draw a few shapes. In the second part, you will start analyzing a set of drawings and answer a few questions bas
I need this homework in 2 hours
This assignment has two parts. In the first part, you will use AutoCAD to draw a few shapes. In the second part, you will start analyzing a set of drawings and answer a few questions based on those drawings.
Part 1 – Draw in AutoCAD
1. Create a new drawing and save it on your course folder in the z drive. Use the acad.dwt as we did for the in-class assignment.
2. Draw the shapes shown below. Use the dynamic input and object snap as appropriate. Use the coordinates on the image as a starting point for each figure. (6 pts.)
3. Save and submit the AutoCAD file and a snippet, or screenshot, of your drawing (dimensions are not required). Type Zoom in the command line and select “All” to display all visible objects before taking the screenshot. Your snippet, or screenshot, should capture all shapes and the origin of the axis.
Part 2 – Interpreting Construction Engineering Drawings
The 110th Cascade Project – Replacement of the existing ditch and culvert system along four blocks in Seattle.
Visit the City of Seattle Public Utilities Neighborhood Projects webpage (http://www.seattle.gov/utilities/neighborhood-projects) and look for the 110th Cascade Projects under “Completed Projects”
1. Briefly descried the project objective and its main features based on the project description and the project resources brochure available on the webpage. (2.5 pts)
Open the Plan Set available at (you might have to ‘copy and paste’ the link on your browser):
2. How many sheets are in this sheet set? (1 pt.)
3. Examine the sheets’ title blocks.
a. Where do the sheet titles appear? (Note: the sheet title is not the same as the project name) (1 pt.)
b. What is the title of Sheet 8? (1 pt.)
4. Go back to Sheet 1 and take a moment to examine the notes regarding “Detail and Section Referencing.” Then move to Sheet 4.
a. On what sheet can you find the detail of a QUICK COUPLING VALVE? (1 pt.)
b. What should a contractor provide to assist in locating a QUICK COUPLING VALVE? (1 pt.)
c. The QUICK COUPLING VALVE detail calls for a piece of #4 rebar. What could the purpose of this rebar be? (1 pt.)
d. What is the scale of the QUICK COUPLING VALVE detail? (1 pt.)
e. List all sheets that include QUICK COUPLING VALVES. (1 pt.)
5. Move to Sheet 12. Take a moment to examine the CUTTING PLANE LINES on the WIER WALL AREA detail (at the top of the page).
a. What is a weir wall? (Note: you can google the term) (1 pt.)
b. On what sheets can I find drawings that include WIER WALLS? (1 pt.)
c. Relative to the direction of water flow, would you be facing UPSTREAM or DOWNSTREAM if you were facing the WIER WALL in the view of SECTION B-B? (2 pts.)
6. Sheet 7 provides a plan and profile view.
a. What information does each view provide to the construction engineer? (2.5 pt.)
b. List and describe five items or devices included in the project. (2.5 pts.)
7. Referring to question 1 and the plan set, what is the design intent of this project? (2.5 pts.)
CCE 201 – Week 2 – HW Assignment
AutoCAD and Interpreting Construction Engineering Drawings: 110th Cascade Project
This assignment has two parts. In the first part, you will use AutoCAD to draw a few shapes. In the second part, you will start analyzing a set of drawings and answer a few questions based on those drawings.
Part 1 – Draw in AutoCAD
1. Create a new drawing and save it on your course folder in the z drive. Use the acad.dwt as we did for the in-class assignment.
2. Draw the shapes shown below. Use the dynamic input and object snap as appropriate. Use the coordinates on the image as a starting point for each figure. (6 pts.)
3. Save and submit the AutoCAD file and a snippet, or screenshot, of your drawing (dimensions are not required). Type Zoom in the command line and select “All” to display all visible objects before taking the screenshot. Your snippet, or screenshot, should capture all shapes and the origin of the axis.
Part 2 – Interpreting Construction Engineering Drawings
The 110th Cascade Project – Replacement of the existing ditch and culvert system along four blocks in Seattle.
Visit the City of Seattle Public Utilities Neighborhood Projects webpage (http://www.seattle.gov/utilities/neighborhood-projects) and look for the 110th Cascade Projects under “Completed Projects”
1. Briefly descried the project objective and its main features based on the project description and the project resources brochure available on the webpage. (2.5 pts)
Open the Plan Set available at (you might have to ‘copy and paste’ the link on your browser):
2. How many sheets are in this sheet set? (1 pt.)
3. Examine the sheets’ title blocks.
a. Where do the sheet titles appear? (Note: the sheet title is not the same as the project name) (1 pt.)
b. What is the title of Sheet 8 ? (1 pt.)
4. Go back to Sheet 1 and take a moment to examine the notes regarding “Detail and Section Referencing.” Then move to Sheet 4.
a. On what sheet can you find the detail of a QUICK COUPLING VALVE? (1 pt.)
b. What should a contractor provide to assist in locating a QUICK COUPLING VALVE? (1 pt.)
c. The QUICK COUPLING VALVE detail calls for a piece of #4 rebar. What could the purpose of this rebar be? (1 pt.)
d. What is the scale of the QUICK COUPLING VALVE detail? (1 pt.)
e. List all sheets that include QUICK COUPLING VALVES. (1 pt.)
5. Move to Sheet 12. Take a moment to examine the CUTTING PLANE LINES on the WIER WALL AREA detail (at the top of the page).
a. What is a weir wall? (Note: you can google the term) (1 pt.)
b. On what sheets can I find drawings that include WIER WALLS? (1 pt.)
c. Relative to the direction of water flow, would you be facing UPSTREAM or DOWNSTREAM if you were facing the WIER WALL in the view of SECTION B-B? (2 pts.)
6. Sheet 7 provides a plan and profile view.
a. What information does each view provide to the construction engineer? (2.5 pt.)
b. List and describe five items or devices included in the project. (2.5 pts.)
7. Referring to question 1 and the plan set, what is the design intent of this project? (2.5 pts.)
Page 1 | 1
Our website has a team of professional writers who can help you write any of your homework. They will write your papers from scratch. We also have a team of editors just to make sure all papers are of HIGH QUALITY & PLAGIARISM FREE. To make an Order you only need to click Ask A Question and we will direct you to our Order Page at WriteDemy. Then fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline.
Fill in all the assignment paper details that are required in the order form with the standard information being the page count, deadline, academic level and type of paper. It is advisable to have this information at hand so that you can quickly fill in the necessary information needed in the form for the essay writer to be immediately assigned to your writing project. Make payment for the custom essay order to enable us to assign a suitable writer to your order. Payments are made through Paypal on a secured billing page. Finally, sit back and relax.
About Wridemy
We are a professional paper writing website. If you have searched a question and bumped into our website just know you are in the right place to get help in your coursework. We offer HIGH QUALITY & PLAGIARISM FREE Papers.
How It Works
To make an Order you only need to click on “Order Now” and we will direct you to our Order Page. Fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline.
Are there Discounts?
All new clients are eligible for 20% off in their first Order. Our payment method is safe and secure.
