Review of the Space Shuttle Challenger Disaster

 3-page single space assessment/review of the Space Shuttle Challenger Disaster. This should include:

Please include at least 3 sources

–Introduction to the Space Transportation System
–The technical problem and reason
–The ethical challenge
-Your recommendations  
 

Notes are attached.

Primary Causes of Engineering Disasters

human factors (including both 'ethical' failure and accidents) design flaws (many of which are also the result of unethical practices) materials failures extreme conditions or environments, and, most commonly and importantly combinations of these reasons

A study* conducted at the Swiss Federal Institute of Technology in Zurich analyzed 800 cases of structural failure in which 504 people were killed, 592 people injured, and millions of dollars of damage incurred. When engineers were at fault, the researchers classified the causes of failure as follows:

* M. Matousek and Schneider, J., (1976) Untersuchungen Zur Struktur des Zicherheitproblems bei Bauwerken, Institut für Baustatik und Konstruktion der ETH Zürich, Bericht No. 59, ETH.

Causes of Failures

Insufficient knowledge …………………………. 36% Underestimation of influence ………………… 16% Ignorance, carelessness, negligence ……….. 14% Forgetfulness, error ……………………………… 13% Relying upon others (without sufficient control)… . 9%

Objectively unknown situation …………………. 7% Imprecise definition of responsibilities ……… 1% Choice of bad quality ………………………………. 1% Other ……………………………………………………. 3%

Engineering Ethics Space Shuttle Challenger Accident

Front Row ( L to R): : Michael J. Smith, Francis R. “Dick” Scobee, Ronald E. McNair;

Back Row ( L to R): Ellison S. Onizuka, S. Christa McAuliffe, Gregory B. Jarvis, and Judith A. Resnik.

January 28, 1986

Space Transportation System

Technical Issues

Ethical Issues

Space Transportation System (STS)

Solid Rocket Boosters

(SRB)

Two – 149 ft x 12ft dia

Liquid Fuel

External Tank (ET)

154 ft x 27.6 ft dia

Shuttle Orbiter (122 ft long 48 ft wide)

Launch Weight

4.5 Million Lbs

SRB Propellant Weight

1.1 Million Lbs (Solid)

ET Propellant Weight

1.65 Million Lbs (Liquid)

Orbiter returns as a glider

Thermal Protection System

Primary System- Ceramic Tiles ( app 30,000)

High Temperature Reusable Insulation (HRSI)

Leading Edges- Reinforced Carbon-Carbon (RCC)

ET- Covered in Foam Insulation (Pre-Launch)

Alternative to HRSI in later flight Fibrous Refractory Composite Insulation (FRCI)

Program History

First Launch – April 12, 1981

Last Launch – July 8, 2011

Total Missions -135

Two Accidents

Challenger – January 28, 1986 (All aboard lost)

Columbia – February 1, 2003 (All aboard lost)

Flight Statistics

Challenger Accident

0.678 sec after lift off – a puff of smoke

From aft field joint of right SRB

58 sec later fire around circumference

of aft field joint

72 – 73 sec. catastrophic failure

Accident Analysis

Challenger

Tank Explosion during ascent

Cause: O-ring leakage from SRB to fuel tank

Contributing Causes -1. Launch outside the proven temperature envelop, 2. Flawed go-no-go decision process, 3. Management

Corrective actions: SRB redesign, improved communications between technologist and program management

The O-Rings

The O-Rings

Redesigned Field Joints

Sequence of Events

Discovering Leaks in the Primary Seal

January 1985: Post-flight hardware inspection of

Flight 51C (Discovery) revealed evidence that hot Roger Boisjoly

combustion gases had compromised the primary seals on two field joints.

Briefing to higher management at Marshall Space Flight Center (MSFC) in Huntsville, Alabama, which included the observations and an explanation of the scenarios that caused the seal erosion and hot gas blow-by.

Morton Thiokol asked to prepare a detailed presentation as part of the Flight Readiness Review for Flight 51E, which was scheduled for launch in April 1985.

This presentation was given in February 1986 at three successively higher-level review boards with refinements in contents made at each level emphasizing that the lower-than-usual launch temperature was responsible for such a large witness of hot gas blow-by, but NASA management insisted that this position be softened for the final review board.

http://www.onlineethics.org/Topics/ProfPractice/Exemplars/BehavingWell/RB-intro/RB1-1.aspx

A Management Decision Overrides an Engineering Recommendation

Teleconference with Kennedy Space Center (KSC) and MSFC started with a history of O-ring damage in field joints.

Data was presented showing a major concern with seal resiliency and the criticality of this on the ability to seal. Two engineers Boijosly and Arnie Thompson presented their arguments for a no-launch.

The presentation ended with the recommendation by the VP Engineering not to launch below 53o F.

This was not well received by NASA. Joe Kilminster, the Vice President of Space Booster Programs (Thiokol), was then asked by NASA for his launch decision. He did not recommend launch, based upon the engineering position just presented.

Then Larry Mulloy of NASA (who was at KSC) asked George Hardy of NASA (who was at MSFC) for his launch decision. George responded that he was appalled at Thiokol's recommendation but said he would not launch over the contractor's objection. Then Larry Mulloy spent some time giving his interpretation of the data with his conclusion that the data presented was inconclusive.

Just as he finished his conclusion, Joe Kilminster asked for a five-minute off-line caucus to re-evaluate the data, and as soon as the mute button was pushed Thiokol’s general manager, Jerry Mason, said in a soft voice, "We have to make a management decision.”

During the closed managers' discussion, Jerry Mason asked in a low voice if he was the only one who wanted to fly. The discussion continued, then Mason turned to Bob Lund, the vice-president of engineering, and told him to take off his engineering hat and put on his management hat. The decision to launch resulted from the yes vote of only the four senior executives. The engineers were excluded from both the final decision and the vote poll.

The telecon resumed, and Joe Kilminster (VP of Space Programs) read the launch support rationale from a handwritten list and recommended that the launch proceed. NASA promptly accepted the recommendation to launch without any probing discussion and asked Joe to send a signed copy of the chart.

The Morton Thiokol Manager of Booster Program at Cape Canaveral Alan MacDonald declined to sign it.

Main People

Boijosly, Arnie Thompson – Engineers, Thiokol

Bob Lund, VP Engineering, Thiokol

Joe Kilminster, VP Space Booster Program, Thiokol

Jerry Mason, GM Thiokol

Alan McDonald, Mgr Booster Program, Cape Canaveral

Larry Mulloy, NASA KSC

George Hardy, NASA MSFC

What is the situation that Boisjoly faces now? He has presented his case. NASA has acted in a way that was unprecedented in Boisjoly's experience. They have put the burden of proof on those who believed it was risky to fly rather than on those who felt it was safe to fly. Fearing that NASA will not continue to make Morton Thiokol the sole contractor for the Solid Rocket Booster program if they insist on holding back the Challenger flight, management has reversed the decision made by engineering. Boisjoly doesn't have the hard data that he has been requesting since last summer and which is now needed to prove that low temperature is a major contributor in hot gas blow-by, and his job appears to be at stake. He has had over a year to work on the joint problem and in that time ten shuttle missions have flown successfully. Is there anything else that can be done at this point?

image2.png

image3.png

image4.png

image5.png

image6.png

image7.png

image8.png

image9.png

image10.png

image11.jpeg

image12.png

image13.png

image14.png

image1.jpeg

Our website has a team of professional writers who can help you write any of your homework. They will write your papers from scratch. We also have a team of editors just to make sure all papers are of HIGH QUALITY & PLAGIARISM FREE. To make an Order you only need to click Ask A Question and we will direct you to our Order Page at WriteDemy. Then fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline.

Fill in all the assignment paper details that are required in the order form with the standard information being the page count, deadline, academic level and type of paper. It is advisable to have this information at hand so that you can quickly fill in the necessary information needed in the form for the essay writer to be immediately assigned to your writing project. Make payment for the custom essay order to enable us to assign a suitable writer to your order. Payments are made through Paypal on a secured billing page. Finally, sit back and relax.

Do you need an answer to this or any other questions?

About Wridemy

We are a professional paper writing website. If you have searched a question and bumped into our website just know you are in the right place to get help in your coursework. We offer HIGH QUALITY & PLAGIARISM FREE Papers.

How It Works

To make an Order you only need to click on “Order Now” and we will direct you to our Order Page. Fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline.

Are there Discounts?

All new clients are eligible for 20% off in their first Order. Our payment method is safe and secure.

Hire a tutor today CLICK HERE to make your first order

Related Tags

Academic APA Writing College Course Discussion Management English Finance General Graduate History Information Justify Literature MLA